Rehab Gas Turbine Power Station
 
Printer-friendly version

Rehab power plant is located in the northern region of Jordan, approximately 70 km north of the capital Amman. The plant site is approximately 835 meters above sea level and located within a rural area surrounded by extensive agricultural land.

Rehab Power Station

 

Rehab power plant comprises 2 simple cycle gas turbines which are nominally rated at 30 MW gross and a 297 MW combined-cycle gas turbine which comprises 2 gas turbines with 100 MW and 1 steam turbine with 97 MW.

 

Rated capacity (MW)

357

Fuel used Natural gas & Diesel oil
Cooling Dry cooling fans

Components of Rehab Power Station

Gas Turbines

Unit
Rated Capacity (MW el)
Fuel (HFO, LFO, NG)
Installation (Year)
Manufacturer Name
Type Name
GT 10
30
NG+LFO
1994
EGT
PG6541 B
GT 11
30
NG+LFO
1995
EGT
PG6541 B
GT 12
100
NG+LFO
1996
EGT
PG9171 E
GT 13
100
NG+LFO
2002
GE
PG9171 E
ST 14
97
-
2005
MHI
-

Electrical Generators

Unit
Capacity (MVA)
Voltage (kV)
Installation (Year)
Manufacturer Name
Type Name
GT 10
37.54
11
1994
Alsthom
T190-240
GT 11
37.54
11
1995
Alsthom
T190-240
GT 12
111.45
15
1996
Alsthom
T240-270
GT 13
108.24
15
2002
Alsthom
T240-270
ST 14
122.94
15
2005
MELCO
-

Generator Transformer

Unit
Capacity (MVA)
Voltage (kV/kV)
Installation (Year)
Manufacturer Name
Type Name
GT 10
42
11/33
1995
Hitachi
ONAF
GT 11
45
11/33
1995
Pauwels Trafo
ONAF
GT 12
148
15/132
1996
Pauwels Trafo
OLF 148/275
GT 13
148
15/132
2002
Pauwels Trafo
OLF 148/275
ST 14
115
15/132
2005
Hyndai
ONAF

Accumulated Statistics in (2016)

 

Unit

Generated energy

Consumed energy

Sent out energy

Fuel Consumption

Running hours

(MWh)

(MWh)

(MWh)

(GJ)

(hr)

GT 10

9,560

51.2

9,509

138,495

39,411

GT 11

9,510

21.2

9,489

139,961

37,757

GT 12 (SC)

2,897

44

2,853

38,586

101,359

GT 13 (SC)

3,533

39

3,494

46,673

94,685

ST 14

618,102

30,437

587665

-

77,452

CC

1,937,586

35,725

1,901,861

17,353,680

-

Total

1,963,086

35,880

1,927,206

17,717,359

-

 

Performance Indicators in (2016)

Unit

Availability (%)

Unplanned outage Factor (%)

planned outage Factor (%)

Efficiency (%) Sent out

Heat rate (KJ/kWh)

Sent out

GT 10

99.35

0.57

0.07

24.72

14,565

GT 11

99.05

0.13

0.82

24.41

14,750

GT 12 (SC)

87.03

2.28

10.69

26.62

13,523

GT13 (SC)

97.77

0.80

1.44

26.95

13,358

ST 14

91.45

1.98

6.57

-

-

CC

92.17

1.68

6.15

39.45

9,125

Total

93.34

1.46

5.20

39.16

9,193